Greetings to the officers and staff of the IC&CE. This message is in
continuation of my earlier message dated 12.5.2014. As I had mentioned the implementation of the CR has
to be taken up in right earnest, but it will require patience and perseverance.
I have got a number of communications urging that immediate DPCs be held as
officers are retiring every month. There is a lot of anxiety as to how the CR
is to be implemented. Through this message I would like to apprise to you all
of the steps being taken at CBEC level and also reiterate to you those steps
which are required to be taken by Cadre Controlling Authorities (CCAs).
You must have already gone through letter F.No. 8/B/106/HRD(M)/2013 dated 28.11.2013 issued by DG(HRD) giving the details of the 6 committees which had been set up for
implementation of the CR. The action to be taken now, flows from the work of
those committees.
The steps to be taken
are as follows:
I. Issue of notification defining the jurisdiction
of the reorganised zones/Commissionerates/Directorates. Letters have
already been issued to the CCs on 13.5.2014 to recheck and resubmit the notifications to be
issued. These notifications are expected to be issued from the concerned wings
of the CBEC by 23.5.2014. Sh. S.B. Singh, Member (CX) is monitoring this.
II. (a) Simultaneously, the notification regarding
allocation of staff in the various grades for the revised formations have
to be issued by AD-IV section of CBEC. Member (P&V) is monitoring the
timely issue of the notification on allocation of staff.
(b) On issue of notification for allocation of
staff, all CCAs must work out the vacancy position, update rosters and
inform the same within one week to Member (P&V) so that the number of fresh
recruitments & category can be intimated to SSC. This is also monitored by
Member (P&V).
III. Action for issue of notification for the amendments
to various statutes based on revised designations has been undertaken by
committee no. V. Some of the amendments are required to be introduced through
Finance Bill since amendments to Act are involved. (Member (B) is monitoring
the work of this committee). Other notifications are to be issued by Board.
Member (B) would also examine the appropriate timelines for each.
IV. For all the new formations which are to come
into existence, location codes have to be given. In addition there would be
requirement for providing thin clients, infrastructure such as WAN/LAN
etc. These matters are under the domain of Dte. of Systems and is being
monitored by me.
V. Immediately after the issue of the notification
mentioned in para I & II, infrastructure committee would be working
out the requirements for additional space for the new formations and
submit their infrastructure proposals (including Budget Requirement) after
collecting and vetting the same. Member (CX) would be monitoring this.
VI. There are 2 other important activities. One is the conduct of
DPCs for promotions to various grades in Group C and B by the CCAs.
(a) There are large number of cadres in group B
& C. DPCs can be done in those cadres which do not require any change in
RRs. Whereas in some other cases, new RRs may have to be drafted or amendments
may be required to the existing RRs. Member (P&V) would be intimating to
the CCAs by 28.5.2014, the RRs in respect of those cadres where no
change is required and for which DPCs can be held. This is necessary to ensure
that DPCs are conducted in a coordinated manner across all the Zones.
(b) CCAs would recall that vide letter No. 8/B/106/HRD(HRM)/2013 dated 13.2.2014 a format had been prescribed to enable monitoring
of APARs by the CCAs. It had been desired that all folders be in readiness by 1.4.2014.
However, reports received from the CCAs indicate
that still considerable work is required in some of the zones. It is reiterated
that unless folders are updated and all action such as finalization of
representations, NRC, vigilance certificate, rosters, etc. are ready, the CCA
will not be able to conduct the DPCs. Member (L&J) has been nominated to
monitor the readiness of the CCAs for holding the DPC in Group B and C cadres.
She would also monitor the conduct of DPCs across all the zones. Member
(L&J) shall take up this action immediately on receipt of the list of RRs
cleared by the Member (P&V).
VII. In so far as the promotions of 2118 officers of Group B to Group A is concerned, the zone of consideration would
involve the verification and updated status of around 10,000 APARs. Letter dated 23.11.2013 of the DG(HRD) indicates that sub committee no. I
of the committee no II has been given the task of ensuring the readiness of the
folders. Member (P&V) is reviewing the work of this committee. It will be
the responsibility of every CCA to ensure that the APAR folders are complete
and correct in all respects. CCAs may therefore contact the sub committee
members to ensure that the folders in respect of group B officers belonging to
their respective zones are complete and correct in all respects. Only
thereafter, verification would be done by AD.II/JS(Admn.) before forwarding to
UPSC. Further update on this shall be given after review. It is reiterated
that unless the work of APAR verification is completed it would not be possible
to move to UPSC for getting the date(s) for holding the DPC. You would all
appreciate that DPC for 2118 officers is quite unprecedented, and one matter which will involve a
lot of work for UPSC as well. Hence officers, staff & associations are
requested to have patience, cooperate & assist the administration to the
maximum so that this major activity can be carried out as smoothly &
swiftly as possible.
(J. M. Shanti Sundharam)
Chairman
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.